Bel Pre Manor Stormwater Pond

As part of the County's effort to protect our waters, the stormwater pond (Pond - 11011) within the Beacon Place Community was selected for upgrade to help reduce stormwater pollution draining into our streams.

 

Bel Pre Manor
Various public events will be held throughout the project phases for residents to learn about the project and to provide input on the design of the project. Check out the Project Schedule and Meetings table at the bottom of the page for more information!

 

 

PROJECT FACTS*
Project Status: In Design
Total Drainage Area: 23.96Ac
Total Percent Impervious: 26.5%
Total Stream Project Length: N/A
Estimated Cost: $275,000
Monitoring: No
Watershed: Anacostia River
Contact: Brett Long
Email: Brett.Long@montgomerycountymd.gov
Phone: (240) 499-8531

     *Information is subject to change

  

        To Download, click (PDF, 517KB)

 

Public Events and Project Schedule*
Event Date / Time Location
Survey and Site Analysis Spring 2013  
Preliminary Site Assessment Summer 2013  
Public Meeting February 2014 Longmead Crossing Clubhouse
Concept Design Plans Summer 2014  
Final Plans Winter/Spring 2017  
Construction Spring/Fall 2017  

*Project schedule is tentative and dates are subject to change.