Germantown Park Stormwater Management and Stream Restoration Project (Phase II)

 

As a part of the County's effort to protect our waters, eight stormwater ponds and a section of stream within the Germantown Park community were selected for restoration to help reduce stormwater pollution draining into our streams. Four of the eight stormwater ponds and the stream section will be included in this phase of the project. The other four stormwater ponds are part of Germantown Park Stormwater Management and Stream Restoration Project (Phase I).

Various public events will be held throughout the project phases for residents to learn about the project and to provide input on the design of the project. Public events and project schedules may vary by site.

 

 

 

Map of Germantown Park Stormwater Management Project
To download, click (PDF, 1.68 MB)

 

 

Sites:

11178 - Pond
  • Site Status: In Design

  • Site Drainage Area: 15 Ac

  • Percent Impervious: 26%

11111 - Pond
  • Site Status: In Design

  • Site Drainage Area: 4.6 Ac

  • Percent Impervious: 48%

10981- Pond
  • Site Status: In Design

  • Site Drainage Area: 5 Ac

  • Percent Impervious: 39%

10972 - Pond
  • Site Status: In Design

  • Site Drainage Area: 1.3 Ac

  • Percent Impervious: 53%

 

Stream
  • Site Status: In Design

  • Site Drainage Area: 36.3 Ac

  • Percent Impervious: 40%

  • Stream Project Length: 800ft

 

Germantown Park Stormwater Facility Retrofits Factsheet (PDF, 464 KB)

 

Germantown Park Stream Restoration

The 800ft stream section between Stormwater Pond 11161(Phase I) and Stormwater Pond 11178(Phase II) was selected to address unstable stream banks and promote aquatic habitat. After the project is completed, the stream will be monitored to evaluate success of project goals.

 

Image of Germantown Park Stream

 

Publid Events and Site Schedule

Calendar Graphic

Survey and Site Analysis

Summer 2013

Calendar Graphic

Preliminary Site Assessment

Summer 2013

Calendar Graphic

Public Meeting

September 17, 2015 / 7:30 pm
Germantown Park Community Center / 18400 Cinnamon Dr. Germantown, MD 20874
Public Meeting Flyer PDF(246KB)

Calendar Graphic

Concept Design Plans

Fall 2014

Calendar Graphic

Final Plans

Summer 2018

Calendar Graphic

Construction

Fall 2018

Calendar Graphic

Monitoring

Post Construction

 

Image of Cinnamon Woods Stream
To download, click (PDF, 363 KB)

 

 
 
 
 
 