A comprehensive review of the Montgomery County Bus Network
The Draft Network Concept is displayed on an interactive map that shows Ride On services as they exist now and how these services could shift in the future to meet the county’s transportation needs. It also includes routes under Metro’s Better Bus initiative to demonstrate how Ride On could operate as WMATA services evolve in the future.
Updated maps coming soon!
Existing Route Proposed for Replacement |
Proposed Replacement Service |
6 |
905 Flex |
7 |
913 Flex |
11 |
1a, 916 Flex |
15 |
Purple Line Light Rail, 17a, 912 Flex, 915 Flex |
28 |
912 Flex |
31 |
906 Flex |
44 |
904 Flex |
51 |
906 Flex |
65 |
903 Flex |
66 |
123 Great Seneca Transit Network (Cobalt) |
67 |
122 Great Seneca Transit Network (Lime); 301a |
96 |
905 Flex |
97 |
902 Flex |
Nationally, there is a movement towards upgraded bus systems that focus on faster, more convenient, and reliable bus services known as Bus Rapid Transit (BRT) systems, known here as Flash. In the draft concept, Flash is: a daily service with limited stops running at a frequency of 8 to 15 minutes apart from 5 AM until 1 AM.
Framework/High-Capacity routes represent a service like Ride On extRa that offer daily service with limited stops and hours. This type of service would run at a frequency of 10 to 15 minutes apart on weekdays from 5 AM until 7 PM, and 30 minutes apart on weekends from 7 AM until 7 PM.
Express routes represent a daily service that operates between key locations, such as today’s Route 100. These routes would run at a frequency of 10 to 15 minutes apart on weekdays and Saturdays from 5 AM until midnight, and every 30 minutes on Sundays from 6 AM until 10 PM.
Commuter routes represent a service that operates to provide weekday bus service making few stops during peak hours. This type of service would run at a frequency of 30 minutes apart on weekdays between 6 AM to 9 AM and 3 PM to 7 PM.
Coverage/Local routes represent a daily bus service that link neighborhoods with transit centers and stations and other activity areas. This type of service would run at a frequency of 15-30 minutes apart on weekdays, and 30 minutes apart on weekends. On weekdays, local routes would run from 5:30 AM until 11 PM, on Saturdays and Sundays from 6 AM until 11 PM.
Microtransit refers to an area where an on-demand transit service would be available, known here as Flex. In these areas, passengers would be able to request service between 6:30 AM and 7:30 PM, Monday through Saturday. Sunday service would be informed by demand. Riders would request their trips approximately 15 to 30 minutes in advance.
The Ride On Reimagined Study is a comprehensive, forward-looking assessment of the bus network that will result in significant recommended changes to how transit operates in Montgomery County based on current and future needs. This study will take an in-depth look at Montgomery County's existing and planned transit systems, including Metrobus services that operate within the County limits and the future Purple Line. The study will also provide an opportunity to guide the future direction of Ride On through data analysis and community engagement. The study will have the primary goal of recommending system-wide changes that address the current and future needs of the community it serves for both Ride On and Metrobus services.
The study will examine the current conditions and the anticipated future of Ride On's service area. The study will engage community leaders, activists, transit riders, and support organizations to gather feedback. An evaluation will be conducted to assess route structure, connectivity, span, and frequency of service through market research analysis, review of land use development, and anticipated technology advancements. The study will also address the County's priorities to improve racial equity and prevent climate change. The image of transit services is important to attract riders. Therefore, an evaluation of Ride On's branding will be examined. In conclusion, the study will set the framework for a plan with recommendations and implementation strategies that best align with the transportation goals of Montgomery County.
The MCDOT Project Coordination Team, with input from key stakeholders, has determined final goals, set objective outcomes, and defined measures to evaluate success. The intent of these goals, outcomes, and measures is to help guide the project principles, and are in alignment with the three priority areas of Moving Forward Together: The Vision for Transportation in Montgomery County, MD:
MCDOT conducted two MURAL whiteboarding sessions with the Project Coordination Team. The first session developed suggested goals under each of the three priority areas, and the second session reviewed and refined the draft goals, outcomes, and measures. From this process, the project team aggregated the suggested goals and associated outcomes, and proposed a measure for each outcome.
We then met with approximately 30 key stakeholders to present a study overview and provide feedback on the goals, outcomes, and measures on Thursday, July 28, 2022.
Goal | Outcome | Measure |
---|---|---|
1-1: Enhance Pedestrian and Rider Safety | Systemwide ADA compliance and overall accessibility | Achieve ADA compliance at all bus stops with a rate per year to be determined and achieve additional accessibility improvements beyond ADA compliance at priority locations |
Standardized bus rider amenities guidelines | Achieve upgrades to bus stops consistent with their level of service with a rate per year to be determined | |
1-2: Improve Bus Operations Safety | Standardized bus stop location guidelines to enhance operational safety and decrease accident rates | Achieve upgrades to or relocations of bus stops consistent with operational safety guidelines with a rate per year to be determined to reduce fatalities and serious injuries for riders, employees, and general public |
A safety reporting system for bus safety issues for both operators and passengers | Implement a comprehensive safety reporting system | |
1-1: Enhance Pedestrian and Rider Safety | Systemwide ADA compliance and overall accessibility | Achieve ADA compliance at all bus stops with a rate per year to be determined and achieve additional accessibility improvements beyond ADA compliance at priority locations |
Standardized bus rider amenities guidelines | Achieve upgrades to bus stops consistent with their level of service with a rate per year to be determined |
Goal | Outcome | Measure |
---|---|---|
2-1: Shift Mode Share from Auto to Bus | Dedicated bus lanes on all identified FLASH and Ride On extRa corridors | Increase the route miles of dedicated bus lanes |
Rides shifted from SOV to bus | Increase number of bus transit trips per capita | |
2-2: Position Transit as the First Choice in Montgomery County | Stable support and source for funding | Achieve a sustainable funding system to meet current and future Ride On/Metro needs and promotes |
A route network that is structured to maximize demand for full range of Ride On/Metro services (Flash, ExtRa, Flex, Fixed Route) | Increase ridership | |
A comprehensive branding plan | Improve brand recognition | |
2-3: Plan Network to Meet Environmental Goals | Reduced fuel and depot operations environmental impacts in alignment with the goals of the Montgomery County Climate Action Plan | Reduce emissions, water, waste, and other environmental impacts from bus operations to help achieve the Climate Action Plan’s goal to cut greenhouse gases emissions 100% by 2035 |
Minimized deadhead time | Reduce deadhead to revenue time ratio | |
2-4: Promote an Ongoing Evaluation of the Network | A strategy for ongoing improvement | Create a self-monitoring system that allows Ride On/Metro to monitor and enhance performance and establishing a measure of ongoing performance to promote productivity and efficiency |
New service to unserved areas | Increase in new jobs and households served by the network that are not presently served by Ride On/Metro (X% of jobs and households within a quarter mile walk of transit) | |
A strategy for improved workforce development | Improve workforce development and retention rates to effectively staff and operate the network |
Goal | Outcome | Measure |
---|---|---|
3-1: Increase Access and Connections for All Users | Expanded reach of network | Increase the route miles of dedicated bus lanes |
Improved network reliability | Improvement in OTP and missed trips | |
3-2: Implement Targeted Equity Actions | Increased all-day service | Increased span of service with consistent headways |
Improved service targeted to equity emphasis areas | Increase in 30-minute transit shed from equity areas | |
3-3: Connect Transit with Economic Development | Transit-oriented development advanced | Square footage of development that priority transit investments unlock in master plan areas |
Partnerships with employers, businesses, and cultural attractions strengthened | Increase participation in TMDs and promotional partnerships | |
3-4: Improve Passenger Experience | Implement better wayfinding | Add wayfinding to bus stops from key nodes and add surrounding neighborhood information at stops |
Improved availability of real-time information | Increase the amount of real-time information, available online, at MC311, and at stations | |
Improved bike and pedestrian connections | Increase overall bicycle and pedestrian accommodations at high ridership and trail-adjacent stops and at stops serving heavily pedestrianized areas |
Various local agencies, businesses, government officials, and transit providers and municipalities constitute the stakeholders that will help shape the structure of the study and provide guidance at various stages throughout the process.
A comprehensive public engagement plan that emphasizes transparency and open communication will be drafted and implemented. Project team members will share information and engage the public using the MCDOT website, social media platforms, pop-up events, at open houses, and in small group discussions.
A market and infrastructure analysis and peer transit system analysis serves as the foundation for this assessment. Peer transit systems include those that largely meet the goals identified for the Montgomery County bus network and are comparable in terms of the size of the operation and geographic service area.
Service concept development is the planning of the reimagined Montgomery County bus network. Work done to this point will serve as the foundation for new service designs and concepts. These concepts will detail how they meet study goals, impact riders, improve the system's performance, and impact the County financially, culminating in a detailed list of recommendations of preferred concepts based on an overall evaluation of the network's strengths and weaknesses.
The service concepts and (resulting) recommendations will guide the Service and Implementation Plan. The implementation proposal will consider making network changes simultaneously, or in phases. The plan will emphasize key components of the previously recommended concepts and include a marketing plan to launch the service.
From December to March, the Ride On Reimagined Project Team met with five focus groups for two sessions each to receive input to help shape the project’s goals, set objective outcomes, and define measures to evaluate success. The input received from both rider and non-rider focus group participants was instrumental in organizing the network concept, developing service characteristics, prioritizing service levels, and determining resource allocation.
The feedback received from facilitated conversations with various stakeholders has served as the foundation for service concept development and the resulting project team recommendations which include better Downcounty-Upcounty direct service between hubs; more connections to recreational/cultural spaces; additional rapid/express service and expansion of the Flex on-demand service.
This analysis will help MCDOT to standardize its internal, systemic processes by ensuring adherence to best practices, and determining consistent directions and instructions on the measures required to complete a specific task or process across the entire Montgomery County Bus Network. These standard operating procedures and guidelines will establish appropriate service and stop operations and quality control measures, ensure legal compliance with all applicable laws and regulations, enable efficient staff onboarding and training, and provide for the institutionalized maintenance of organizational knowledge.
The Ride On Reimagined Project Team has met with Montgomery County staff, WMATA staff, and local elected officials, to review and receive feedback on the various opportunities and challenges associated with the countywide transit network. These conversations with members of the Ride On Reimagined advisory group are ongoing and will continue through the Summer of 2023.
The study team reviewed and evaluated various plans, transit recommendations and findings for Montgomery County. Analyzing these previous plans aids in adding local context to this study of the county’s bus network and provides background of other local projects in the area. Ride On is a key aspect in many of transit plans throughout the county. These plans included functional master plans, area and sector plans, and current transit planning projects. These plans have common themes and points on transit accessibility, multimodal connections, and sustainability.
The study team reviewed a commuter survey administered by Montgomery County in 2014 and the Title VI Program Update to help gauge historic ridership patterns, mode share, and ridership demographics. These surveys illustrated contrasting attitudes and preferences towards public transit.
As part of the existing conditions analysis, the study team evaluated the transit propensity of defined areas in the county. A Transit Propensity Index (TPI) synthesizes density of people and jobs, socioeconomic characteristics such as household income and race/ethnicity, and access to personal vehicles into a single metric representing the relative demand for transit services within a defined area. The county was divided into five subareas, which were examined for potential opportunities to capture latent demand or, conversely, to modify service delivery strategies to improve efficiency:
A market and origin/destination analysis helps provide insight into current transit demand and patterns, usage, and transit network operations. This analysis reveals that high population and job densities promote and encourage ridership, as existing bus ridership is clustered in these areas. Pre- and post-COVID-19 ridership was examined to understand its impacts on transit.
In the scheduled bus operations analysis, the study team examined bus trips, schedule adherence, and speed to provide insight in to how well the county’s bus network performed. Pre- and post-COVID performance metrics provided context to the effects of the pandemic on transit operations.
Visit our interactive data map.
The Customer Satisfaction Survey is an instrumental part of the Ride On Reimagined study. It provides MCDOT with a clearer understanding of current, former, and potential riders’ perceptions, opinions, and overall transit riding experience. This data will help with developing recommendations for system-wide changes that address the current and future needs of the community for both Ride On and Metrobus services.
MCDOT fielded this online survey in English, Spanish, Chinese, French, Amharic, Vietnamese, Hindi, and Korean from September 8 through October 7, 2022. Participants were invited to take the survey through emails, Ride On’s website, and via more than a dozen social media posts. In addition, our community engagement team hosted four in-person pop-up events on September 8, 13, 20, and 28 at various transit sites across Montgomery County.
The survey yielded 2,170 valid responses from a diverse group of riders with varying demographics, routes, trip frequencies, trip purposes, and perspectives, following a data cleaning process to eliminate bots and people living outside the MCDOT region.
Ridership analysis revealed concentrated transit activity. These hotspots remained the same from 2019 to 2021, but the level of boardings and alightings in 2021 were about half those of 2019.
Weekday boarding and alighting hotspots include:
Our analysis found the following:
We reviewed how drive time and transit time compared throughout the county:
There are five county subareas where we examined service and performance: