Fawsett Road Improvement

The project includes the design and construction of roadway pavement and storm drain system along 1400 feet of Fawsett Road from east of 1119 Fawsett Road to the end of the cul-de-sac in Potomac. The road remained 18 feet wide and open section with grass ditches on both sides of the road.

Construction started in September 2014 and ended in December 2014.

Rebecca Park, P.E. Capital Projects Manager