Redland Road
(From Crabbs Branch Way to Baederwood Lane)

The project includes the construction of approximately 1,300 feet of eight feet wide pervious concrete bike path on the south side of Needwood Road from Redland Road to Deer Lake Road with underdrain system and varying width of grass buffer between the edge of the road and the proposed bike path. The project also includes the reconstruction of the ramps at the southeast corner of the intersection of Redland Road and Needwood Road and relocations of the two Audible Pedestrian Signal poles.

The construction started in December 2015 and ended in April 2016.

Shirley Reeves-Collette, Area Engineer
Montgomery County Department of Transportation
Division of Transportation Engineering
100 Edison Park Drive, 4th Floor
Gaithersburg, Maryland 20878
Phone: 240-773-3412
E-mail: shirley.reeves-collette@montgomerycountymd.gov


Area Map
  • Needwood Road - Pre-construction

    Needwood Road - Pre-construction

    • Verizon Pole Relocation

      Verizon Pole Relocation

      • Clearing Ground

        Clearing Ground

        • Construction Previous Pavement

          Construction Pervious Pavement

          • Construction Previous Pavement

            Construction Pervious Pavement

            • Construction Previous Pavement

              Construction Pervious Pavement

              • Construction Previous Pavement

                Construction Pervious Pavement

                • Construction Previous Pavement

                  Construction Pervious Pavement

                  • Construction Previous Pavements

                    Construction Pervious Pavement

                    • Construction Previous Pavement

                      Construction Pervious Pavement

                      • Storm Drain Installation

                        Storm Drain Installation

                        • Putting down sod

                          Putting down sod

                          • Geo Matting on Slope

                            Geo Matting on Slope