Franklin Avenue Sidewalk 

 

This project provides for continuous sidewalk along the north side of Franklin Ave from Colesville Rd (US 29) to University Blvd (MD 193). The project includes 4600 linear feet of sidewalk, new curb and gutter with storm drain system.

  • The stormwater plans were redesigned and submitted for approval - October 2023
  • The construction schedule will be posted once the plans are approved
 

Robert Gonzales, Sidewalk Section Chief
Montgomery County Department of Transportation
Division of Transportation Engineering
100 Edison Park Drive, 4th Floor
Gaithersburg, Maryland 20878
Phone: 240-777-7296
E-mail: [email protected]