Grosvenor BiPPA

 

This project is to prepare 100% Final Design for sidewalk and shared use path along MD 355 from Pooks Hill Road to Strathmore Avenue. The design includes signing, marking, geometric, drainage and signal improvement.

100% Design is scheduled to be completed in spring 2021.
Construction is planned to start in the fall of 2021.