Redland Road Bridge Replacement (M-0056)

This project provides for the replacement of the existing bridge (M-0056) on Redland Road over Mill Creek. The existing single-span concrete slab bridge will be removed and replaced with a new prestressed concrete box beam superstructure and precast concrete abutments and wing walls. The new superstructure will be constructed in the same location and will use accelerated construction techniques to reduce the overall construction time.

The project includes approach roadway work at each end of the bridge as necessary to tie-in to the existing roadway. The bridge and road will be closed to traffic during construction. Accelerated bridge construction techniques will be utilized to minimize the disruption to the traveling public and local community.

Redland Road Bridge

September 2023 Updates

Montgomery County Planning Board Mandatory Referral Hearing - October 12, 2023

On Thursday, October 12, 2023, the Montgomery County Planning Board will conduct a Mandatory Referral Hearing on this project. The meeting is open to the public. Interested community members are encouraged to listen in, and to provide written and/or oral testimonies regarding this project.

For more information, please visit https://montgomeryplanningboard.org/agendas .


May 2023 Updates

Virtual Public Hearing Scheduled for 60% Design Milestone

The Redland Road Bridge Replacement project is approaching 60% design milestone, and we would like to invite you to the virtual public hearing to learn more about the latest on the design, as well as share your comments with us.

This virtual public hearing will be held on Wednesday, June 7, 2023 at 6:30pm. The project team will present the 60% design, project costs and schedule, as well as collect community input and answer any questions you might have about the project. Additional materials will be posted by the end of May to allow ample time for you to review them prior to the public hearing.

We request that you register beforehand. To register for the meeting, please fill out this form here . You will receive instructions for signing into the meeting. If you require special accommodations to participate or to view materials, please contact the project manager, Angel Cheng.

Public Feedback

Public input is key to the success of a capital improvement project as it helps us to better understand the needs and concerns of the community. Your input is important to us!

Please provide us with your comments by July 10, 2023 via the following methods:

 
Project Schedule
  • 60% Design – Q2 2023
  • Public Hearing – Q2 2023
  • Mandatory Referral – Q3 2023
  • Final Design Complete – Q2 2024
  • Utility Relocation Begins – Q2 2025 (Estimated)
  • Construction Begins – Summer 2025 (Estimated)

Angel Cheng, P.E.
Project Engineer
MCDOT Division of Transportation Engineering
100 Edison Park Drive, 4th Floor
Gaithersburg, Maryland 20878
Phone: 240-777-7274
E-mail: [email protected]