Clarksburg Road-Snowden Farm Parkway

 

Clarksburg Road at MD 355: Construction improvements to the Clarksburg Road, MD 355 intersection include additional auxiliary turn lanes, bike lanes, sidewalks, and a shared-use path.

Clarksburg Road / Snowden Farm Parkway: Construction improvements including roadway widening (400 feet of roadway) and vertical curve revision along the Clarksburg Road southern approach to Snowden Farm Parkway; a 600-foot transition to the existing roadway section north of the intersection; and a 400-foot section of Snowden Farm Parkway will be widened at the eastern approach to Clarksburg Road.

The work schedule commenced on October 17, 2022. Construction is anticipated to be completed in the Spring of 2024. Work to be performed under lane closures and flagging operations. The County will work to minimize disruptions to surrounding residents and business communities.

MCDOT Division of Transportation Engineering
100 Edison Park Drive, 4th Floor
Gaithersburg, Maryland 20878

Marc Cross, Area Engineer
[email protected]
240-271-1294

TIm Faulkner, Inspector
[email protected]
443-392-2435