The project is located in Redland, Montgomery County, Maryland. The project limits are from Crabbs Branch Way, crossing over Indianola Drive and run parallel with Anamosa Drive and Buena Vista Drive. Work will include repairs to approximately 1400.0 LF of the existing 72” Corrugated Metal Pipe (CMP) by invert lining in addition to replacing a portion of the pipe culvert.
Rebar Installation from Manhole
Rebar Installation Sta 11+10
The Crabbs Branch Culvert Repair project will begin mid-summer approximately July 1, 2024. Work will commence with the replacement of a section of the existing 72" Corrugated Metal Pipe. Work will progress downstream repairing the deteriorated pipe invert toward the outfall at the pond. The length of the storm drain work is approx. 1400 linear feet and will be done in stages utilizing the existing manholes for access along the proposed Heavy Duty Mulch Mat Access Road. The work is projected to take approximately 6 months. (180 Days).
Montgomery County Department of Transportation Division of Transportation Engineering 100 Edison Park Drive, 4th Floor Gaithersburg, Maryland 20878 [email protected] Marc Cross, Area Engineer [email protected] 240-578-7098 Timothy Cameron, Construction Representative [email protected] 240-855-9101