Parkside Estates Sidewalk Project


The Parkside Estates Community Sidewalk Project proposes the installation of 5-foot-wide, ADA-compliant, concrete sidewalks with a variable 0 to 3-foot-wide greenspace along the following roadways in Derwood:

  • the north side of Briardale Road from Shady Grove Road to Redland Road;
  • the west side of Briardale Road from Dace Drive to Shady Grove Road;
  • the northeast, north and west side of Baederwood Lane from Bethayres Road to Redland Road;
  • the east side of Bethayres Road from Baederwood Lane to Bethayres Court;
  • the west side of Dace Drive from Polara Place to Briardale Road; and
  • the southeast side of Frontenac Terrace from Baederwood Lane to the culdesac.

Project Schedule

The Parkside Estates Community Sidewalk Proposal was approved with modification on August 1, 2022. Construction of the approved sidewalks is anticipated in late-August or early-September 2022.

Come to our Virtual Public Hearing!

Montgomery County invites you to attend an online public hearing to learn and testify about the Parkside Estates Community Sidewalk Proposal.

The hearing will be held on Wednesday, April 20, 2022, at 6:30 p.m. to present the project scope, obtain community testimony, and answer questions. We request that you register beforehand. Please us the online registration form (click here) to register for the hearing . On the morning of April 20, 2022, you will receive an email, providing the Zoom meeting link, passcode, and connection instructions for signing in and participating using the internet-based virtual platform.

We look forward to your participation. If you require special accommodations to participate in the hearing or to view materials, please contact MCDOT’s Planning Specialist, Lori Jean Main, via email at [email protected] .

Written Testimony

Written Testimony carries the same weight as oral testimony. Residents are welcome to testify orally at the virtual public hearing, submit written testimony or both. Please provide your Written Testimony by Wednesday, May 18, 2022, via email to [email protected] .

Annual Sidewalk Program
Division of Transportation Engineering
100 Edison Park Drive, 4th FL
Gaithersburg, Maryland 20878
[email protected]

Robert Gonzales, Sidewalk Section Chief
[email protected]
240-777-7296
Geary “Rick” Holley, Field Supervisor
[email protected]
240-777-7273
Juan Berrios, Construction Representative
[email protected]
240-777-7278
Lori Jean Main, Contractor
[email protected]
240-777-7271
   

Please note that due to COVID-19, we are currently teleworking. Our phones are operational and we welcome any questions or comments you may have. Stay safe and well!

Thank You!

Area Map