Brighton Dam Road Bridge (M-0229)

This project provides for the rehabilitation of the existing Brighton Dam Road Bridge No. M-0229 over Brighton Dam of Triadelphia Reservoir. This 602-foot long 15-span bridge, which is supported by Brighton Dam, is in need of repairs to the concrete parapets, bridge deck joints, prestressed concrete beams, concrete abutment backwalls, streetlights, asphalt approach roadways and concrete sidewalks to enhance the safety of the traveling public and the integrity of the dam. New drainage troughs will be installed on both sides of buttress nos. 11, 13, 15, 17, 19, 21, 23 and 25. The existing storm inlets on the approach roadways at both ends of the bridge will be improved as needed.

Project Schedule

  • Design: March 2021 – Spring 2023
  • Construction: Spring 2024 – Summer 2024

Come to our Virtual Hearing

Montgomery County Department of Transportation (MCDOT), Howard County Department of Public Work (HCDPW) and Washington Suburban Sanitary Commission (WSSC) invite you to attend an online public hearing for the rehabilitation of Brighton Dam Road Bridge No. M-0229 over Brighton Dam .  The hearing will not take place in person due to the COVID-19 outbreak, but you can join us through your computer or by telephone.

A virtual hearing will be held on Wednesday, November 30, 2022, at 7:00 p.m . The purpose of the hearing is to present the project and obtain testimony and comments from the area residents.

We request that you register beforehand. Please use the online registration form (click here) to register for the virtual meeting. On the morning of the November 30th hearing, an electronic invitation to participate in this hearing will be emailed to you with the Zoom connection instructions.

We look forward to your participation. If you require special accommodations to participate in the meeting or to view materials, please contact the MCDOT’s Project Manager, Greg Hwang, by email at Greg.Hwang@montgomerycountymd.gov .

Record Open

Following the conclusion of this public hearing, the recording of the public hearing will be made available online on the MCDOT’s project webpage under the “Project Documents” tab. The record will remain open for two weeks to allow any person who was unable to attend the hearing an opportunity to have their comments included into the public record and be fully considered. The official closing date, by which all written testimony and comments must be received, is Wednesday, December 14, 2022, at 7:00 p.m. Submissions can be made via the following:

Project Managers

Greg Hwang / 240-777-7279 / Greg.Hwang@montgomerycountymd.gov
MCDOT, Division of Transportation Engineering
100 Edison Park Drive, 4th Floor, Gaithersburg, MD 20878

Jake Weir / 410-313-6153 /  JWeir@Howardcountymd.gov
HCDPW, Bureau of Engineering, Transportation & Special Projects Division (Structures)
7125 Riverwood Drive, Suite B, Columbia, MD 21046

Samir Khalil / 301-206-8564 / Samir.Khalil@wsscwater.com
WSSC, Engineering and Environmental Services Division
14501 Sweitzer Lane, Laurel, MD 20707

Area Map