The Cameron Street to Planning Place Bikeway will connect the north end of Fenton Street (at Cameron Street) to the existing “Purple Pathway” located outside the Planning Department office and will link through that site to Spring Street and Woodland Drive.
The facility will be a two-way bikeway (also known as a cycletrack) which will run along one side of the Garage 2 exit roadway and through an unused alley behind the Sheraton Hotel.
Construction started on the project in May 2021 and is expected to be complete by mid-summer 2021.
Construction started in May 2021, and work is expected to take approximately 2 months to complete.
Final Design Plans
February 4, 2019 Public Meeting
“To watch the recording, you will need to download the Adobe Connect App, available at the link above.”
Matt Johnson, A.I.C.P. BiPPA Program Manager Division of Transportation Engineering 100 Edison Park Dr., 4th Floor Gaithersburg, MD 20878 E-mail: [email protected] Phone: 240-777-7237