The Phase I provides an eight feet wide shared use path along the south side of Needwood Road over approximately 2,400 feet of length from the beginning of Nature Trail, west of Lake Needwood to the ICC Trail terminus. This project is approved for $860,000 from Maryland Department of Transportation for design and construction for Phase I of the project.
The construction for Phase I started in June 2016 with ten months of duration.
Shirley Reeves-Collette, Area Engineer Montgomery County Department of Transportation Division of Transportation Engineering 100 Edison Park Drive, 4th Floor Gaithersburg, Maryland 20878 Phone: 240-773-3412 E-mail: [email protected]
Limit of Disturbance Staked out for Trail
Excavation for the Trail
Compacting Soil for Trail
Laying Out Graded Aggregate Base followed by Asphalt Base