Thompson Road Connection-Phase II reconfigures the bus lot at Briggs Chaney Middle School and adds a driveway to the bus lot for traffic improvement. The addition of the driveway creates a one-way bus loop that the traffic would enter at the existing driveway and would exit at the proposed driveway at the intersection Rainbow Drive and Thompson Road.
The construction for the project started on July 22, 2016 with approximately one month of duration.
Shirley Reeves-Collette, Area Engineer Montgomery County Department of Transportation Division of Transportation Engineering 100 Edison Park Drive, 4th Floor Gaithersburg, Maryland 20878 Phone: 240-773-3412 E-mail: [email protected]
Tweets about #ThompsonRd from:moco_dte