Martin Luther King Swim Center Renovation

Special Notice: Place Holder for special notice

Notice: Project Completed

Show the project location in google map 1201 Jackson Rd, Colesville, MD. 20904

Martin Luther King Swim Center Renovation

Funding/Expenditure Schedule: APPROVED

Project Team

Montgomery County Government
Department of General Services

Division of Building Design & Construction

Division Chief: Hamid Omidvar, AIA
[email protected]
Section Chief: Suresh Patel
Project Manager: Leo Perez

Architect / Engineer

CDCI, Inc, Inc.

Contractor

CDCI Inc.,

For operations inquiries. Please contact.

Montgomery County Department of Recreation

240-777-8060

Current Phase: Construction

Phase 1 - Parking Spaces Repair
Construction commenced on April 23,2018
Construction completed September 2019
Phase 2 - Stair Towers Renovation
Construction commenced on September 23, 2019
Construction will be completed August 2021

The main building that houses the two indoor pools of this 19,000 SF facility was closed during the summer of 2019 at which time dehumidification, air conditioning and pool filtering equipment as well as pool lighting were upgraded (as part of the energy savings-ESCO project).

Limited use of the main indoor pool started in September 2020, the main building/indoor pools reopened to the general public on December 16, 2020 and renovation work continued during the fall and winter with phase 1 of replacement of the roof (flat areas) and upgrades to the video surveillance system and mass notification system; new bike racks and benches were added at the front of the building; a CHP (combined heat and power) plant was also installed as part of Energy Modernization program (ESCO).

With the facility closed due to Covid-19, interior painting (upper floor and pool areas), installation of new ceiling grid and tiles, replacement/refinishing of doors, new vestibule sliding doors, a new reception desk, addition of a small meeting room, and phase 2 of replacement of the roof (sloped roof over main indoor pool) have been completed.

The following work has also been completed: renovation of restrooms at the upper and lower floors, addition of a second lower floor single restroom and renovation of the existing one, renovation of the locker rooms, replacement of the railing at the stairs and the balcony overlooking the pool, installation of new signage and water fountains, ADA compliant parking and walkways at the main entrance, new carpet, new furniture, pool starting blocks, diving platforms and balcony ADA seating. Work for a new 3-meter dive stand with guardrails and a 16’ diving board is ongoing.

Live Project Video

Ribbon Cutting Ceremony

Event Images

Event Images

Event Image

The Martin Luther King, Jr. Swim Center is a 19,000 SF facility consisting of a competition indoor pool, indoor teach pool, hot tubs as well as an outdoor pool. The indoor two-floor facility has a meeting room, party room, locker rooms, restrooms, exercise rooms, gallery overlooking the competition pool, offices, etc. There is also a separate building with locker rooms and restrooms servicing the outdoor pool. This facility is being renovated following recommendations of the facility assessment and condition report that was performed in 2018.

Architectural and Construction Images

New roof above main indoor pool

New roof above main indoor pool

Main indoor pool walls, ceiling, ductwork, louvers were painted

Main indoor pool walls, ceiling, ductwork, louvers were painted

Upgraded lighting at main indoor pool

Upgraded lighting at main indoor pool

Indoor teach pool walls, ceiling, framing, ductwork were painted

Indoor teach pool walls, ceiling, framing, ductwork were painted

Small meeting room was created at end of hallway

Small meeting room was created at end of hallway

New reception desk

New reception desk

New sliding doors

New sliding doors

New bike racks

New bike racks

Architectural and Construction Images

Laundry 131

Conference Room 119

Main Lobby 101

Architectural and Construction Images

Reception/Admin. & Staff Work Area 142 & 142A

Main Lobby 101

Architectural and Construction Image

TBD