Norbeck Manor Stormwater Pond Retrofit Project

Norbeck Manor Stormwater Project The Norbeck Manor Stormwater Pond was selected for upgrades and improvements after a 2018 inspection of the pond conducted by DEP revealed several structural issues. Repair work on the pond, which was originally constructed in 1988, will also bring the pond into compliance with current safety and performance standards to reduce the impacts of stormwater runoff on our local streams and the Chesapeake Bay.

Upgrades and improvements to the stormwater management pond include: removal of accumulated sediment to reestablish the original pond bottom elevation, replace the existing corrugated metal riser with a new concrete riser structure, slipline the existing corrugated metal spillway pipe with 36" high-density polyethylene pipe, forebays will be created at each of the two stormwater inflow pipes to capture sediment, aquatic plants will be planted around the perimeter of the pond.
View more pictures of the project >>

Project Details

Public Events and Project Schedule

Calendar Graphic

Design Begins

Summer 2021

Calendar Graphic

Preliminary Site Assessment

Summer - Fall 2021

Calendar Graphic

Public Meeting

July 2022
Norbeck Manor Community

Calendar Graphic

Final Plans

November 2023

Calendar Graphic

HOA Meeting

Summer 2024

Calendar Graphic

Construction

Summer 2024

*Project schedule is tentative and dates are subject to change.