Lincoln High School Renovation

Special Notice: Place Holder for special notice

Notice: Project Completed

Show the project location in google map 595 N Stonestreet Ave, Rockville, MD 20850

Lincoln High School

Funding/Expenditure Schedule: APPROVED

Project Team

Montgomery County Government
Department of General Services

Division of Facilities Management

Division Chief: Gregory Boykin
Gregory.Boykin@montgomerycountymd.gov
Section Chief: Singh Hargurpreet
Project Manager: Mike Lowe

Structural Engineer of record

Gale Associates, Inc.

Contractor Team

Carpentry- Burgos Contractors,
LLC Masonry Repairs- Walker Willis Corporation
Historical Preservation Architect: CEM Design, Mr. Craig Moloney, AIA, LEED AP
Electrical & Fire Alarm- Electric Advantage, Inc.
Roofing Repairs-CitiRoof
Asbestos Abatement-ACM
Services Environmental Consulting & Testing- APEX Inc.

Current Phase: Construction

Project Schedule:

Phase 1 - Carpentry Repair
Carpentry repairs 12/2022 - 01/2023
Phase 2 - Roofing Repair
Roofing repairs 01/2023 - 02/2023

Live Project Video

Ribbon Cutting Ceremony

Event Images

Event Images

Event Image

The former Lincoln High School is a landmark in Montgomery County's black education history. Opened in 1935, it is the oldest remaining high school building and the only junior high school constructed for black students in Montgomery County. The renovation includes roof replacement and building envelope repair, in order to protect further deterioration of the building.

Lincoln High School - Existing (Before Renovation) Conditions

Lincoln School, Front Exterior View

Front Exterior View

Lincoln School, Exterior Side View

Exterior Side View

Lincoln School, Exterior Side View

Exterior Side View

Lincoln School, Rear Exterior View

Rear Exterior View

Lincoln School, Exterior Side View

Exterior Side View

Lincoln School, Abatement of chipping Lead Based paint on Exterior wood siding

Abatement of chipping Lead Based paint on Exterior wood siding

Lincoln School, Abatement of chipping Lead Based paint on Exterior wood siding

Abatement of chipping Lead Based paint on Exterior wood siding

Lincoln School, Abatement of Lead based paint from Exterior windows

Abatement of Lead based paint from Exterior windows

Lincoln School, Water damage to existing interior Floor structure

Water damage to existing interior Floor structure

Lincoln School, Water damage to existing interior Floor structure

Water damage to existing interior Floor structure

Lincoln School, Existing Electrical concerns/hazards, Repairs planned to make safe

Existing Electrical concerns/hazards, Repairs planned to make safe

Lincoln School, Existing Electrical concerns/hazards, Repairs planned to make safe

Existing Electrical concerns/hazards, Repairs planned to make safe

Lincoln School, Existing Electrical concerns/hazards, Repairs planned to make safe

Existing Electrical concerns/hazards, Repairs planned to make safe

Lincoln School, Existing Electrical concerns/hazards, Repairs planned to make safe

Existing Electrical concerns/hazards, Repairs planned to make safe

Lincoln School, Existing Electrical concerns/hazards, Repairs planned to make safe

Interior roof leaks and mold Prior to abatement

Failing Floor in Interior Office Area Prior to repairs

Failing Floor in Interior Office Area Prior to repairs

Flooring failure long term water damage

Flooring failure long term water damage

Overhead electrical cables-Remove from service for safety

Overhead electrical cables-Remove from service for safety

Asbestos Flooring tiles-Prior to abatement

Abestos Flooring tiles-Prior to abatement

Parapet wall-Prior to Masonry repairs

Parapet wall-Prior to Masonry repairs

Interior wall damage from long term damage

Interior wall damage from long term damage

Roof deck and Interior framing damage from long term Roof leak

Roof deck and Interior framing damage from long term Roof leak

Pipe Insulation-Asbestos containing-Prior to Abatement

Pipe Insulation-Asbestos containing-Prior to Abatement

Lincoln High School - Work In Progress

Lincoln School, Front Entry

Front Entry

Setting of Temporary Fondations for Structural Shoring Towers

Setting of Temporary Fondations for Structural Shoring Towers

Mold Asbestos Abatement work

Mold Asbestos Abatement work

Lincoln School,Shoring Installation

Shoring Installation

Lincoln School,Shoring Installation2

Shoring Installation

Overall of main room

Overall of main room

Area where new 24-foot long floor beam was indicated1

Area where new 24-foot long floor beam was indicated

Beginning of floor beam installation1

Beginning of floor beam installation

Floor beam installation1

Floor beam installation

Floor beam and joist installation1

Floor beam and joist installation

Installation of the new flooring

Installation of the new flooring

Installation of the new flooring

Installation of the new flooring

Demolition & removal of deteriorated Wooden Roofing Structure

Demolition & removal of deteriorated Wooden Roofing Structure

Installation of the new Wooden Roof structure

Installation of the new Wooden Roof structure

Installation of the new Wooden Roof structure

Installation of the new Wooden Roof structure

Installation of the new Wooden Roof structure

Installation of the new Wooden Roof structure

Roof membrane removal

Roof membrane removal

Load bearing wall at the front building

Load bearing wall at the front building

Roof joist support at load bearing wall at the back of the building

Roof joist support at load bearing wall at the back of the building

Load bearing wall at the back of the building

Load bearing wall at the back of the building

Roof deck removal

Roof deck removal

Roof membrane installation

Roof membrane installation"

Roof membrane installation

Roof membrane installation

Insulation, cover board and membrane installation

Insulation, cover board and membrane installation

Roof deck removal

Roof deck removal

Roof deck removal2 - Roof Joist installation

Roof Joist installation

Lincoln High School - Work Completion

Exterior windows, Painted

Exterior windows, Painted

Exterior windows, Painted

Exterior windows, Painted

Exterior windows, Painted

Exterior windows, Painted

Exterior windows, Painted

Exterior windows, Painted

Main Entry door, Painted

Main Entry door, Painted

Exterior windows, Painted

Exterior windows, Painted

Finished work, Interior

Finished work, Interior

Finished work, Interior

Finished work, Interior

Finished work, Interior

Finished work, Interior

Finished work-Roof

Finished work-Roof

Finished work-Roof

Finished work-Roof