Remediation Land Use Activities

Passive Recreation Uses

Summary Fact Sheets

Environmental Site Compliance Maps

Maryland-National Capital Park and Planning Commission

Phase 0 – Aerial Mapping, Field Survey & Waste Delineation

Phase 0 Work Activities

Phase 1 – Nature and Extent Study

Phase 1 Work Activities

Nature and Extent Study Report

Submitted to the Maryland Department of the Environment on November 19, 2010

  • Nature and Extent Study Report - Text Only (PDF, 473 kb)
  • NESR - Figures (PDF, 11.9 MB)
  • NESR - Tables (PDF, 248 kb)
  • NESR - Appendix A - Technical Memorandums, Contact Information, and Regulatory Correspondence (PDF, 15.8 MB)
    • Attachment 1: Post-Closure Care Monitoring and Maintenance Technical Memorandum
    • Attachment 2: Landfill Gas Management - Chronology
    • Attachment 3: Stormwater Infrastructure Review Technical Memorandum
    • Attachment 4: County Contact and Website Documentation
    • Attachment 5: Regulatory Correspondence
    • Attachment 6: Waste Delineation Technical Memorandum
    • Attachment 7: Aerial and Field Survey Technical Memorandum
    • Attachment 8: Protected Resource Investigations Technical Memorandum
  • NESR - Appendix B - MCL Exceedance Trend Plots (PDF, 4.5 MB)
  • NESR - Appendix C - Boring and Well Construction Logs (PDF, 9.9 MB)
  • NESR - Appendix D - Analytical Data Tables (PDF, 139 kb)
  • NESR - Appendix E - Laboratory Analytical Reports for Subsurface Soil (PDF, 20.4 MB)
  • NESR - Appendix F - Laboratory Analytical Reports for Subsurface Soil (PDF, 13.8 MB)
  • NESR - Appendix G - Laboratory Analytical Results for Groundwater (PDF, 8.7 MB)
  • NESR - Appendix H - Laboratory Analytical Results for Surface Water (PDF, 1.8 MB)
  • NESR - Appendix I - Laboratory Analytical Results for Surface Soil (PDF, 5.4 MB)
  • NESR - Appendix J - Supporting Information for Risk Screening (PDF, 1.1 MB)

Nature and Extent Study - Amendment 1

Remediation Feasibility Memorandum

Phase 2 – Assessment of Corrective Measures