Remediation Land Use Activities
Passive Recreation Uses
- Gude Landfill Passive Land Use Planning, May 2012 (PDF, 2.47 mb)
Summary Fact Sheets
- Assessment of Corrective Measures Fact Sheet, May 2012 (PDF, 35 kb)
- Nature and Extent Study Amendment 1 Fact Sheet, May 2012 (PDF, 94 kb)
- Nature and Extent Study Fact Sheet, December 2010 (PDF, 34 kb)
Environmental Site Compliance Maps
- Overall Maximum Contaminant Level (MCL) Compliance Extent Map with groundwater contours, April and September 2011 sampling events (PDF, 354 kb)
- Overall Maximum Contaminant Level (MCL) Compliance Extent Map without groundwater contours, April and September 2011 sampling events (PDF, 467 kb)
Maryland-National Capital Park and Planning Commission
- Permit for Construction on Park Property, Maryland-National Capital Park and Planning Commission, issued September 21, 2009 (PDF, 1.1 MB)
- Application for Park Construction Permit for Rock Creek Regional Park (Needwood) - August 18, 2009 (PDF, 3.1 MB)
- Recreational Park Plan, Maryland-National Capital Park and Planning Commission - July 13, 1983 (PDF, 693 kb)
Phase 0 – Aerial Mapping, Field Survey & Waste Delineation
- Consultant Proposal for Phase 0 (PDF, 4.4 MB)
Phase 0 Work Activities
- Consultant report: Waste Delineation Study, January 2010 (PDF, 12.4 MB)
Phase 1 – Nature and Extent Study
- Consultant Proposal for Phase 1 (PDF, 84 kb)
Phase 1 Work Activities
- Nature and Extent Study Plan, July 2010 (appendices excluded) (PDF, 7.5 MB)
- Consultant report: Proposed Groundwater Well and Data Collection Boring Locations, sent to the Maryland Department of the Environment on January 29, 2010 (PDF, 3.6 MB)
Nature and Extent Study Report
Submitted to the Maryland Department of the Environment on November 19, 2010
- Nature and Extent Study Report - Text Only (PDF, 473 kb)
- NESR - Figures (PDF, 11.9 MB)
- NESR - Tables (PDF, 248 kb)
- NESR - Appendix A - Technical Memorandums, Contact Information, and Regulatory Correspondence (PDF, 15.8 MB)
- Attachment 1: Post-Closure Care Monitoring and Maintenance Technical Memorandum
- Attachment 2: Landfill Gas Management - Chronology
- Attachment 3: Stormwater Infrastructure Review Technical Memorandum
- Attachment 4: County Contact and Website Documentation
- Attachment 5: Regulatory Correspondence
- Attachment 6: Waste Delineation Technical Memorandum
- Attachment 7: Aerial and Field Survey Technical Memorandum
- Attachment 8: Protected Resource Investigations Technical Memorandum
- NESR - Appendix B - MCL Exceedance Trend Plots (PDF, 4.5 MB)
- NESR - Appendix C - Boring and Well Construction Logs (PDF, 9.9 MB)
- NESR - Appendix D - Analytical Data Tables (PDF, 139 kb)
- NESR - Appendix E - Laboratory Analytical Reports for Subsurface Soil (PDF, 20.4 MB)
- NESR - Appendix F - Laboratory Analytical Reports for Subsurface Soil (PDF, 13.8 MB)
- NESR - Appendix G - Laboratory Analytical Results for Groundwater (PDF, 8.7 MB)
- NESR - Appendix H - Laboratory Analytical Results for Surface Water (PDF, 1.8 MB)
- NESR - Appendix I - Laboratory Analytical Results for Surface Soil (PDF, 5.4 MB)
- NESR - Appendix J - Supporting Information for Risk Screening (PDF, 1.1 MB)
Nature and Extent Study - Amendment 1
- Nature and Extent Study Report Amendment 1, November 2011, (PDF, 324 kb)
- Exhibits - Amendment 1 (PDF, 1.5 MB)
- Figures - Amendment 1 (PDF, 7.2 MB)
- Tables - Amendment 1 (PDF, 114 kb)
- Appendix A - Amendment 1 (PDF, 742 kb)
- Appendix B - Amendment 1 (PDF, 9.5 MB)
- Appendix C - Amendment 1 (PDF, 3.1 MB)
- Appendix D - Amendment 1 (PDF, 5.1 MB)
- Appendix E - Amendment 1 (PDF, 6.1 MB)
- Appendix F - Amendment 1 (PDF, 156 kb)
- Appendix G - Amendment 1 (PDF, 3.1 MB)
- Appendix H - Amendment 1 (PDF, 5.5 MB)
Remediation Feasibility Memorandum
- Remediation Feasibility Memorandum Transmittal Letter from DEP to MDE - January 11, 2011 (PDF, 355 kb)
- Remediation Feasibility Memorandum: Potential Remediation Alternatives - January 11, 2011 (PDF, 2.3 MB)
Phase 2 – Assessment of Corrective Measures
- Consultant Proposal for Phase 2 (PDF, 841 kb)
- Supplemental Consultant Proposal for Phase 2 (PDF, 28 kb)
- Groundwater Metals Sampling Technical Memorandum - October 8, 2013 (PDF, 2.73 MB)